3 Steps towards a limecrete floor in The Great Barn

Here is clearly displayed the first 3 stages of a limecrete floor in this wonderful old clay barn in Wiltshire

Ready for the terram to be laid on top of the soil to create a clear barrier between soil and recycled foam glass. This will prevent any moisture wicking through the recycled foam glass into the limecrete.

Here the recycled foam glass has been laid over the terram, with the sides lapped up slightly.

All ready for the under floor heating pipes to be clipped into place by the customer’s heating company. We will return soon to lay 100mm screed.

Leave a Reply

Your email address will not be published. Required fields are marked *

*