Projects

Take a look at previous limecrete and hempcrete projects or explore the map to see projects in your area.

Limecrete floor for a local Norfolk Church with runs for trunking and boxes. Once cured, the wood will be removed. No two jobs are the same!

Recycled foam glass is laid, compressed using a wacker plate and then topped with geotextile membrane. The geogrid is then laid out for the underfloor heating to be laid. The holes are for electrical floor sockets.

The channels have been formed by the wood ready for the wiring to be installed once the limecrete has cured.

The wood will be lifted once the limecrete has cured